Installation
2–14 975-0400-01-01 Revision H
This manual is for use by qualified personnel only.
Wiring
DC Terminal Connector Locations
Terminal connectors for DC wiring are located inside the wiring compartment.
The labels above the DC wiring terminals and inside the wiring compartment
identify all the connection points. See Figure 2-9.
Wire Size and Over-Current Protection Requirements
The wiring, over-current protection devices (fuses and circuit breakers), and
installation methods used must conform to all national and local electrical code
requirements.
Wiring must be protected from physical damage with conduit or a strain relief
clamp.
To preserve signal integrity on communication cables, the BTS, auxiliary output,
and network cables must pass through a different conduit than the conduits used
for PV and battery cables. You should pull the BTS cable through the conduit first
as the connector may not fit if other wires have been pulled first.
Important:
Installations must meet all local electrical codes.This equipment
should only be installed by a qualified electrician or a Certified Renewable
Energy System Installer.
WARNING
ELECTRICAL SHOCK HAZARD
Isolate positive and negative PV and battery circuits before wiring.
Failure to follow these instructions can result in death or serious injury.
Figure 2-9 DC Connection Terminals