Instruction Manual

Table Of Contents
Installation
2–32 975-0400-01-01 Revision H
This manual is for use by qualified personnel only.
Configuration Screens
When power is first applied to the solar charge controller, several configuration
screens prompt you to enter the following information:
A “DC out” (battery) connection, which enables the solar charge controller to
read and share the same battery information with other Xanbus-enabled
devices that charge or invert from the same battery bank.
Battery type: Flooded (default), Gel, AGM, Custom.
If you select Custom, the settings for battery type match the default settings
for Flooded batteries until you reconfigure the settings on the Custom Battery
menu. See “Setting a Custom Battery Type” on page 3–8.
Nominal battery voltage of the battery bank connected to the solar charge
controller.
Enter the correct system voltage on this screen.
Battery bank capacity, in amp-hours.
Commissioning a Single Unit Without a System Control Panel
To commission the solar charge controller:
1. Apply battery power to the unit.
The LCD displays the two startup screens in sequence, as shown in Table 2-
4, followed by the first of four configuration prompt screens. The four
configuration prompt screens guide you through the minimum setup required
for the solar charge controller to operate properly.
Figure 2-17 Configuration Screens








Table 2-4 Startup Screens on Charge Controller Front Panel Display
Display Duration Description

5 seconds Startup message 1: solar charge controller model number
 
 
5 seconds Startup message 2: Firmware version and build numbers. This
screen is also available in the Device Menu for referencing during
normal operation (see page 3–19).