Operation
4–4 975-0400-01-01 Revision H
This manual is for use by qualified personnel only.
If there is sufficient energy from the PV array, the default operation screen is
displayed while the solar charge controller is charging or not charging (in the “no
float” stage when configured for two-stage charging).
When more than one solar charge controller is installed and connected to the
Xanbus network, the default operation screen appears as shown in Table 4-2.
You can view more operation screens by pressing the down arrow button. The
screens appear in the order shown in Table 4-3.
Each screen is displayed for a maximum of 30 seconds. If you do not press a
button during that time period, the LCD shows the default operation screen
again.
Table 4 - 2 Multi-Unit Default Operation Screen
Display Description
Power being produced by the system now.
Total measured output voltage and output current of all
units in the system.