Installation Guide

Figures
Figure 1 Typical Installation 21
Figure 2Minimum Clearance Requirements 26
Figure 3Removing the wiring compartment cover 26
Figure 4Wiring Compartment with Lexan Barrier 27
Figure 5Knockout dimensions 28
Figure 6Dimensions and knockout locations 28
Figure 7Mounting the Charge Controller 29
Figure 8Chassis ground connector 30
Figure 9DC Terminal Connector Locations 31
Figure 10Typical Wiring Diagram for a Negative-Grounded System (48 V Battery Bank
Shown) 36
Figure 11Multiple unit DC wiring 38
Figure 12Auxiliary output vent fan application 39
Figure 13Network terminator 40
Figure 14Network layout 41
Figure 15Attaching the BTSto a battery terminal 43
Figure 16Installing the BTS 44
Figure 17MPPT Operational Window 58
Figure 18Maximum Expected Output Current Versus Input Voltage, Conext MPPT 80
600 59
Figure 19Maximum Expected Output Current Versus Input Voltage, Conext MPPT
100 600 59
Figure 20Output power vs. ambient temperature, Conext MPPT 80 600 62
Figure 21Output power vs. ambient temperature, Conext MPPT 100 600 62
Conext MPPT 80 and MPPT 100 Installation Guide
990-91319 This document is for use by qualified personnel 14