WARNING
HAZARD OF EXPLOSION
Do not install the charge controller in a sealed compartment containing batteries.
Failure to follow these instructions can result in death, serious injury, or equipment
damage.
NOTICE
CHARGE CONTROLLER DAMAGE
The charge controller can overheat if installed in a sealed, indoor enclosure. Do not install
the charge controller in a sealed compartment.
Failure to follow these instructions can result in equipment damage.
To help ensure optimal and safe operation, make sure there is adequate clearance around
the charge controller. See Table 1 and Figure 2. If clearances are reduced below these
minimums, charging performance might be impaired.
Location Minimum Clearance
Above
and below
6 inches (150 mm). Do not mount charge controllers in a vertical stack.
In front
Sufficient room to allow for easy access to see the LEDs and to perform
maintenance.
Sides
No clearance requirement. One charge controller can be mounted on the
side of the Conext Power Distribution Panel (PDP) (Part Number 865-1015-
01). For more information, see the Conext XW+ or Conext XW Pro
Inverter/Charger Installation Guide. Other installations must follow the
guidelines in this Guide.
Table 1Minimum clearance requirements
Conext MPPT 80 and MPPT 100 Installation Guide Installation