Installation Guide

Figure 16Installing the BTS
+
+
+
+
1
2
1 Insert the BTS plug into the charge controller’s BTS port.
2 Attach the BTS to a battery terminal or to the side of a battery.
6. Replace the charge controller’s wiring compartment cover.
Commissioning
Conext SCP
You must use the SCP to commission the charge controller. For information about SCP
navigation and menus, see the Conext MPPT 80 and MPPT 100 Solar Charge Controller
Operation Guide.
In place of the SCP, the Conext Gateway (Part Number 865-0329) can also be used. The
Conext Gateway allows you to configure and monitor the charge controller through a web
interface on a PC or laptop. See the Conext Gateway Owner's Guide (975-0806-01-xx).
NOTICE
INCOMPATIBLE EQUIPMENT
You must use the SCP with firmware version 1.05.00 or higher for full compatibility with the
charge controller. For information on updating your firmware, contact customer service. The
Conext Config Tool is required for upgrading.
Failure to follow these instructions can result in equipment damage.
Conext Config Tool
The Conext Config Tool (Part Number 865-1155) is a commissioning tool used for
configuring or upgrading a Conext system.
Installation Conext MPPT 80 and MPPT 100 Installation Guide
990-91319 This document is for use by qualified personnel 44