Schneider Electric AGS User Manual

Installation
2–2 975-0307-01-01 Rev G
Preparing an Installation
Before installing the Conext Automatic Generator Start (AGS) (AGS),
consider how and where the unit will be mounted. Pre-plan the
connection routes between the Conext AGS, the generator, thermostats,
and the Conext System Control Panel (SCP).
Tools and Materials Required
The following tools and materials may be needed to install the Conext
AGS:
Mounting template (supplied)
Wiring harness (manufacturer part number 809-0917, supplied)
Four #6 self-tapping screws, 1¼ inch (supplied), or M3, 30 mm
(supplied)
#16 or #18 AWG wire (1.5 mm
2
or 1.0 mm
2
) (see “Wire Size and
Length” on page 2–7)
Xanbus network cables
Network terminator
Phillips screwdriver
Drywall anchors if mounting on drywall
Wire cutters and wire strippers
5A inline fuse holders (1 to 3 pieces as required)
Choosing a Location
The Conext AGS should be installed in a location that meets the following
requirements:
Dry The unit is intended for use in a dry location. The Conext
AGS
complies with UL458 Marine Supplement drip-test
requirements, but the location should be as dry as
possible.
Cool The Conext AGS operation is guaranteed between
-20 and 50°C (-4 and 122°F).
975-0307-01-01_RevG(AGS-Owners).book Page 2 Thursday, August 27, 2015 2:01 PM