Conext SW 4024-120 Install Guide
Table Of Contents
- Conext™ SW Inverter/Charger
- Exclusion for Documentation
- Document Number: 975-0639-01-03 Revision: Date: 5-2020
- Contact Information solar.schneider-electric.com
- Information About Your System
- About This Guide
- Important Safety Instructions
- Safety Information
- Precautions When Working With Batteries
- FCC Information to the User
- Installation
- Materials List
- Conext SW Front and Side Panels
- Conext SW Supplied Accessories
- Conext SW Required Accessory
- Installation Information
- Before You Begin the Installation
- Installation Codes
- Xanbus Network System
- Xanbus System
- Xanbus-enabled Products and Other Accessories
- Installation Planning
- Planning Preparations
- Components of the Inverter Power System
- Unpacking and Inspecting the Conext SW Inverter/Charger
- Installation Tools and Materials
- Inverter/Charger Installation
- Overview
- Step 1: Choosing a Location for the Inverter/Charger
- Step 2: Mounting the Inverter/Charger
- Step 3: Connecting the AC Input and AC Output Wires
- AC System Bonding
- Step 4: Installing the DC Switchgear and Connecting the DC Cables
- Step 5: Connecting the BTS and Xanbus-enabled Components
- Step 6: Performing Checks Prior to Initial Start-Up
- Step 7: Testing Your Installation
- Battery Information
- Battery Bank Sizing
- Estimating Battery Requirements
- Restrictions on Motor Size
- Battery Cabling and Hook-up Configurations
- Specifications
- Inverter Specifications
- Charger Specifications
- AC Transfer Specifications
- Physical Specifications
- Environmental Specifications
- Regulatory
- Wiring Diagrams
- Single-Inverter System (Off-Grid/Power Backup)
- Single-Inverter System Renewable Energy (Solar)
Materials List
975-0639-01-03 1–3
This guide for use by qualified personnel only
Conext SW Front and Side Panels
Before you begin to operate the Conext SW after installation, review the front
panel features shown in Figure 1-3 and described in the next table. A detailed
view of the lights and buttons on the front panel is also shown.
Figure 1-2 Conext SW Front and Side Panels
1
77
3
2
4
6
5
TOP TOP
Item Description
1 Front Panel contains the Inv Enable and Clear Fault | Reset buttons, as
well as various LEDs (status indicator lights). See “Front Panel Buttons
and Status LEDs” on page 1–4.
2 Network and communications ports. See “AC and DC Terminals,
Network and Communication Ports Panel” on page 1–5.
3 DC battery terminals. See “AC and DC Terminals, Network and
Communication Ports Panel” on page 1–5.
4 AC Ground terminals. See “AC and DC Terminals, Network and
Communication Ports Panel” on page 1–5.