Conext SW 4024-120 Install Guide
Table Of Contents
- Conextâ„¢ SW Inverter/Charger
- Exclusion for Documentation
- Document Number: 975-0639-01-03 Revision: Date: 5-2020
- Contact Information solar.schneider-electric.com
- Information About Your System
- About This Guide
- Important Safety Instructions
- Safety Information
- Precautions When Working With Batteries
- FCC Information to the User
- Installation
- Materials List
- Conext SW Front and Side Panels
- Conext SW Supplied Accessories
- Conext SW Required Accessory
- Installation Information
- Before You Begin the Installation
- Installation Codes
- Xanbus Network System
- Xanbus System
- Xanbus-enabled Products and Other Accessories
- Installation Planning
- Planning Preparations
- Components of the Inverter Power System
- Unpacking and Inspecting the Conext SW Inverter/Charger
- Installation Tools and Materials
- Inverter/Charger Installation
- Overview
- Step 1: Choosing a Location for the Inverter/Charger
- Step 2: Mounting the Inverter/Charger
- Step 3: Connecting the AC Input and AC Output Wires
- AC System Bonding
- Step 4: Installing the DC Switchgear and Connecting the DC Cables
- Step 5: Connecting the BTS and Xanbus-enabled Components
- Step 6: Performing Checks Prior to Initial Start-Up
- Step 7: Testing Your Installation
- Battery Information
- Battery Bank Sizing
- Estimating Battery Requirements
- Restrictions on Motor Size
- Battery Cabling and Hook-up Configurations
- Specifications
- Inverter Specifications
- Charger Specifications
- AC Transfer Specifications
- Physical Specifications
- Environmental Specifications
- Regulatory
- Wiring Diagrams
- Single-Inverter System (Off-Grid/Power Backup)
- Single-Inverter System Renewable Energy (Solar)
Installation
1–10 975-0639-01-03
This guide for use by qualified personnel only
Xanbus-enabled Products and Other Accessories
Product/Accessory (Shown above) Product Number/s
1 Conext SW DC Switchgear* 865-1016*
2 Conext SW AC Switchgear 865-1017
3 MPPT 60 150 Solar Charge Controller 865-1030-1
MPPT 80 600 Solar Charge Controller (not shown) 865-1032
4 Conext SW On/Off Remote Switch (not shown) 865-1052
5 System Control Panel (SCP) 865-1050
6 Conext ComBox 865-1058
7 Automatic Generator Start (AGS) 865-1060
8 Conext Battery Monitor 865-1080-01
9 Battery Temperature Sensor (BTS) 808-0232-02
10 3-ft network cable (0.9 m) 809-0935
25-ft network cable (7.6 m) 809-0940
75-ft network cable (22.9 m) 809-0942
*
required accessory for code-compliant installation in Canada and USA.
/
25-ft cable 75-ft cable3-ft cable
3
1
2
5
6
8
10
7
9