Conext SW 4024-120 Install Guide
Table Of Contents
- Conext™ SW Inverter/Charger
- Exclusion for Documentation
- Document Number: 975-0639-01-03 Revision: Date: 5-2020
- Contact Information solar.schneider-electric.com
- Information About Your System
- About This Guide
- Important Safety Instructions
- Safety Information
- Precautions When Working With Batteries
- FCC Information to the User
- Installation
- Materials List
- Conext SW Front and Side Panels
- Conext SW Supplied Accessories
- Conext SW Required Accessory
- Installation Information
- Before You Begin the Installation
- Installation Codes
- Xanbus Network System
- Xanbus System
- Xanbus-enabled Products and Other Accessories
- Installation Planning
- Planning Preparations
- Components of the Inverter Power System
- Unpacking and Inspecting the Conext SW Inverter/Charger
- Installation Tools and Materials
- Inverter/Charger Installation
- Overview
- Step 1: Choosing a Location for the Inverter/Charger
- Step 2: Mounting the Inverter/Charger
- Step 3: Connecting the AC Input and AC Output Wires
- AC System Bonding
- Step 4: Installing the DC Switchgear and Connecting the DC Cables
- Step 5: Connecting the BTS and Xanbus-enabled Components
- Step 6: Performing Checks Prior to Initial Start-Up
- Step 7: Testing Your Installation
- Battery Information
- Battery Bank Sizing
- Estimating Battery Requirements
- Restrictions on Motor Size
- Battery Cabling and Hook-up Configurations
- Specifications
- Inverter Specifications
- Charger Specifications
- AC Transfer Specifications
- Physical Specifications
- Environmental Specifications
- Regulatory
- Wiring Diagrams
- Single-Inverter System (Off-Grid/Power Backup)
- Single-Inverter System Renewable Energy (Solar)
Installation
1–18 975-0639-01-03
This guide for use by qualified personnel only
Inverter/Charger Installation
Overview
This section provides detailed information on installing the Conext SW. The
overall procedure is divided into seven steps:
Step 1: Choosing a Location for the Inverter/Charger on page 1–19
Step 2: Mounting the Inverter/Charger on page 1–20
Step 3: Connecting the AC Input and AC Output Wires on page 1–22
Step 4: Installing the DC Switchgear and Connecting the DC Cables on page 1–25
Step 5: Connecting the BTS and Xanbus-enabled Components on page 1–29
Step 6: Performing Checks Prior to Initial Start-Up on page 1–31
Step 7: Testing Your Installation on page 1–31