Conext SW 4024-120 Install Guide
Table Of Contents
- Conextâ„¢ SW Inverter/Charger
- Exclusion for Documentation
- Document Number: 975-0639-01-03 Revision: Date: 5-2020
- Contact Information solar.schneider-electric.com
- Information About Your System
- About This Guide
- Important Safety Instructions
- Safety Information
- Precautions When Working With Batteries
- FCC Information to the User
- Installation
- Materials List
- Conext SW Front and Side Panels
- Conext SW Supplied Accessories
- Conext SW Required Accessory
- Installation Information
- Before You Begin the Installation
- Installation Codes
- Xanbus Network System
- Xanbus System
- Xanbus-enabled Products and Other Accessories
- Installation Planning
- Planning Preparations
- Components of the Inverter Power System
- Unpacking and Inspecting the Conext SW Inverter/Charger
- Installation Tools and Materials
- Inverter/Charger Installation
- Overview
- Step 1: Choosing a Location for the Inverter/Charger
- Step 2: Mounting the Inverter/Charger
- Step 3: Connecting the AC Input and AC Output Wires
- AC System Bonding
- Step 4: Installing the DC Switchgear and Connecting the DC Cables
- Step 5: Connecting the BTS and Xanbus-enabled Components
- Step 6: Performing Checks Prior to Initial Start-Up
- Step 7: Testing Your Installation
- Battery Information
- Battery Bank Sizing
- Estimating Battery Requirements
- Restrictions on Motor Size
- Battery Cabling and Hook-up Configurations
- Specifications
- Inverter Specifications
- Charger Specifications
- AC Transfer Specifications
- Physical Specifications
- Environmental Specifications
- Regulatory
- Wiring Diagrams
- Single-Inverter System (Off-Grid/Power Backup)
- Single-Inverter System Renewable Energy (Solar)
Installation
1–30 975-0639-01-03
This guide for use by qualified personnel only
Figure 1-14 Conext SW BTS and Xanbus Connections
Battery
Negative
Battery
Positive
Xanbus Stacking REM BTS
/
(1) Install the BTS sensor on the
battery.
Method
(a) involves mounting the
sensor to the negative battery post
which allows the internal battery
temperature to be sensed providing
the most accurate results.
Method
(b) attaches the sensor to the
side of the battery using the self-
adhesive backing which also
provides good results in most
situations.
(2) Plug the BTS connector to the BTS
port of the inverter/charger.
(2)
(1)(a)
(1)(b)
(3)
(c)
BTS
battery cable
battery terminal
(3) Connect the Xanbus-enabled devices
using the provided network cable. Terminate
each end of the network with a network
terminator
(c) and (d).
(d)
WARNING
FIRE HAZARD
Follow the stacking of wires as shown in 1(a) of the illustration below.
Failure to follow these instructions can result in death or serious injury.