- Installation
- Materials List
- Conext SW Front and Side Panels
- Conext SW Supplied Accessories
- Conext SW Required Accessory
- Installation Information
- Before You Begin the Installation
- Installation Codes
- Xanbus Network System
- Xanbus System
- Xanbus-enabled Products and Other Accessories
- Installation Planning
- Planning Preparations
- Components of the Inverter Power System
- Unpacking and Inspecting the Conext SW Inverter/Charger
- Installation Tools and Materials
- Inverter/Charger Installation
- Overview
- Step 1: Choosing a Location for the Inverter/Charger
- Step 2: Mounting the Inverter/Charger
- Step 3: Connecting the AC Input and AC Output Wires
- AC System Bonding
- Step 4: Installing the DC Switchgear and Connecting the DC Cables
- Step 5: Connecting the BTS and Xanbus-enabled Components
- Step 6: Performing Checks Prior to Initial Start-Up
- Step 7: Testing Your Installation
- Battery Information
- Battery Bank Sizing
- Estimating Battery Requirements
- Restrictions on Motor Size
- Battery Cabling and Hook-up Configurations
- Specifications
- Inverter Specifications
- Charger Specifications
- AC Transfer Specifications
- Physical Specifications
- Environmental Specifications
- Regulatory
- Wiring Diagrams
- Single-Inverter System (Off-Grid/Power Backup)
- Single-Inverter System Renewable Energy (Solar)
Safety
vi 975-0639-01-03
This guide for use by qualified personnel only
Safety Information
NOTE: Turning off inverter mode using the Inv Enable switch on the front panel,
disabling the inverter and charger functions using the SCP, and putting the unit in
Standby mode will not reduce an electrical shock hazard.
DANGER
ELECTRICAL SHOCK AND FIRE HAZARD
Installation must be done by qualified personnel to ensure compliance with all
applicable installation and electrical codes and regulations. Instructions for
installing the Conext SW are provided here for use by qualified installers only.
Failure to follow these instructions will result in death or serious injury.
DANGER
ELECTRICAL SHOCK AND FIRE HAZARD
• Read all instructions, cautionary markings, and all other appropriate
sections of this guide before installing the Conext SW.
• Exercise extreme caution at all times to prevent accidents.
• Do not cover or obstruct ventilation openings.
• Do not mount in a zero-clearance compartment. Overheating may result.
• Do not open nor disassemble the inverter/charger. There are no user-
serviceable parts inside.
• Do not expose to rain or spray.
• Disconnect and lockout all AC and DC sources before servicing. Servicing
includes maintenance or cleaning or working on any circuits connected to
the inverter/charger. See following note.
Failure to follow these instructions will result in death or serious injury.