Conext XW Pro Installation Guide
Figure 61 Conduit Box Raceways
2. Insert the RJ45 jack on the cable into one of the two AC Sync ports.
3. Route the cable as shown in Figure 62 . Route any additional communication cables
through the raceways. Replace the wiring raceways, ensuring not to pinch the
cables. Secure the raceways to the Conduit Box with the screw that was removed
earlier.
Figure 62 Installing the AC sync and Xanbus Cables
Note: In a dual-inverter system, install an AC Sync Cable from INV1 to INV2. In a triple-
inverter system, daisy-chain an AC Sync Cable from INV1 to INV2 and from INV2 to
INV3.
Conext XW Pro Installation Guide Communication
103 This manual is intended for use by qualified personnel 990-91228A-01