Conext XW Pro Installation Guide

Single-Inverter System (Backup Only) With a Power Distribution Panel (PDP)
Figure 66 Single-Inverter System (Backup Only) With a Power Distribution Panel (PDP)
NL1L2NL1L2NL1 L2
AC IN
GRID
(AC1)
AC OUT
INV
OUT
AC IN
GEN
(AC2)
NG
L1 L2
L2
L1
1
2
3 4
1
2 4
5 7
8
3
6
5
7
6
8
8
Actual wiring requirements may vary.
Cable routing may vary.
See sections on “Knockout Selection” and
“Communications Network Preparation”.
See “Torque Requirements” for torque values.
For torque connections to the battery terminals,
consult the battery manufacturer’s
recommendations.
Conext
Gateway
AGS (optional)
Main utility panel
Inverter load
sub-panel
AC generator
Generator disconnect
AC breakers
DC disconnect
Battery bank
AC Sync cable
Xanbus cable
Hot L1
Hot L2
Positive (+) battery
terminal
Negative (-) battery
terminal
Positive (+)
battery terminal
Negative (-)
battery terminal
Neutral
BTS cable
Ground
Network terminator
Wiring Diagrams Conext XW Pro Installation Guide
990-91228A-01 This manual is intended for use by qualified personnel 119