Conext XW Pro Installation Guide

Pre-Installation
Before installing the Conext XW Pro, read all instructions and cautionary markings in this
Installation Guide.
Note: Obtain all necessary permits prior to starting the installation. Installations must
meet all local codes and standards. Installation of this equipment should only be
performed by skilled personnel such as qualified electricians and Certified Renewable
Energy (RE) System installers.
Note: If multiple Conext XW Pro's are planned, refer to the Conext XW Pro Multi-unit
Power System Design Guide (990-91373) for additional details and system solutions
for larger installations.
WARNING
HEAVY EQUIPMENT
The Conext XW Pro weighs approximately 120 lbs (54 kg). A two-person lift is required. To
prevent personal injury, always use proper lifting techniques during installation.
Failure to follow these instructions can result in death, serious injury, or equipment
damage.
NOTICE
EQUIPMENT DAMAGE
n The Automatic Transfer Relays are rated at 60 A.
n Loads connected at AC OUT must not exceed the inverter's overload ratings or the 60 A
limit, whichever is lower. Unless an external contactor or external transfer switch is
used, the 60 A limit also applies to loads connected to the AC OUT bus of multiple
inverters connected in parallel.
Failure to follow these instructions can result in equipment damage.
Planning the Installation
n Read this entire chapter before beginning the installation. It is important to plan the
installation from beginning to end.
n Assemble all tools and materials needed for the installation.
n If multiple Conext XW Pro's are planned, refer to the Conext XW Pro Multi-unit Power
System Design Guide (990-91373).
Installation Tools and Materials
To complete the installation, you will need the following tools:
n Socket wrench, appropriately sized
n Phillips head screwdriver, appropriately sized
n Level
Conext XW Pro Installation Guide Pre-Installation Planning
25 This manual is intended for use by qualified personnel 990-91228A-01