Conext XW Pro Installation Guide

Figure 16 Wall-mounting the Conext XW Pro
WARNING
HEAVY EQUIPMENT
The Conext XW Pro weighs approximately 120 lbs. A two-person lift is required. To prevent
personal injury, always use proper lifting techniques during installation.
Failure to follow these instructions can result in death, serious injury, or equipment
damage.
2. Lower the Conext XW Pro chassis flange onto the mounting plate.
3. Secure the bracket at the top of the Conext XW Pro chassis with two #10 self-tapping
screws (included).
4. Wall-mount the PDP and any additional Conext XW Pros using this same procedure.
Installation tip
The PDP is designed to mount on the right side of the inverter/charger, but it can be
configured to mount on the left side instead. For more information, see the Power
Distribution Panel (PDP) Installation Guide.
Conext XW Pro Installation Guide Pre-Installation Planning
33 This manual is intended for use by qualified personnel 990-91228A-01