Conext XW Pro Installation Guide

Wiring Additional Conext XW Pro units with a PDP
This section provides instructions for making AC and DC connections between multiple
Conext XW Pro units and a Power Distribution Panel (PDP), using the cables that are
included with each PDPand Connection Kit for INV2 INV3 PDP.
Note: The installation steps described in this section require a Connection Kit for INV2
INV3 PDP (part number 865-1020-02) and PDP 120/240V 60A Breaker Kit (part
number 865-1215-01) for each additional Conext XW Pro.
For more information, contact your local Schneider Electric Sales Representative or
visit our website at: https://solar.schneider-electric.com/tech-support/
NOTICE
EQUIPMENT DAMAGE
Be sure to finish all wiring (AC, DC, Xanbus, communications) when installing additional
Conext XW Pro units including wiring in "Installing AC sync and Xanbus cables" on
page102 prior to powering up the system.
Failure to follow these instructions can result in equipment damage.
Pre-Installation Steps
DANGER
HAZARD OF ELECTRIC SHOCK, EXPLOSION, ARC FLASH, AND FIRE
n Apply appropriate personal protective equipment (PPE) and follow safe electrical work
practices. See NFPA 70E or CSA Z462.
n This equipment must only be installed and serviced by qualified electrical personnel.
n Never operate energized with covers removed
n Energized from multiple sources. Before removing covers identify all sources, de-
energize, lock-out, and tag-out and wait 5 minutes for circuits to discharge
n Always use a properly rated voltage sensing device to confirm all circuits are de-
energized.
Failure to follow these instructions will result in death or serious injury.
Wiring Conext XW Pro Installation Guide
990-91228A-01 This manual is intended for use by qualified personnel 74