Conext XW+ 230V Installation Guide
Table Of Contents
- Conext™ XW
- Inverter/Charger
- Conext™ XW
- Inverter/Charger
- About This Guide
- Important Safety Instructions
- Contents
- Introduction
- Overview
- Conext XW+ Features
- Optional Accessories
- Conext XW+ Conduit Box
- Conext XW+ Power Distribution Panel
- Conext XW+ Connection Kit for INV2 INV3 PDP
- Conext MPPT 60 150 Solar Charge Controller
- Conext MPPT 80 600 Solar Charge Controller
- Conext System Control Panel
- Conext Automatic Generator Start
- Conext ComBox
- Conext Battery Monitor
- Battery Fuse Disconnect Box (250A)
- Battery Fuse Disconnect Box (160A)
- Pre-Installation and Wall-Mounting
- Wiring the Conext XW+ Inverter/ Charger
- Removing the AC Access Panel and PDP Internal Faceplates
- Communication Ports and BTS Port
- Wiring the Conext XW+ Inverter/Charger without a PDP
- Basic Functional Test – Single Inverter
- Basic Functional Test - Multiple Inverters
- Wiring the Conext XW+ Inverter/Charger with a PDP
- Pre-Installation Steps
- Conext XW+ Power Distribution Panel Internal Faceplate Removal
- Conext XW+ Inverter/Charger Grounding
- Making DC Connections with a PDP
- Single Inverter/Charger DC Connections
- Dual Inverter/Charger DC Connections
- Triple Inverter/Charger DC Connections
- AC Wiring with a Conext XW+ Power Distribution Panel
- Xanbus Network Installation
- Conext XW+ Inverter/Charger Accessories Installation
- Specifications
Contents
xiv 975-0714-01-01
This manual is for use by qualified personnel only
3 Wiring the Conext XW+ Inverter/Charger
Removing the AC Access Panel and PDP Internal Faceplates - - - - - - - - - - - - - - - - - - - - - - - - - 3–2
AC Access Panel Removal - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–2
Communication Ports and BTS Port - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–4
AUX Port - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–4
AUX+12V Voltage Supply - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–5
AUX-RPO: User Remote Power OFF (RPO) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–5
User Line Wiring - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–6
AUX Port Terminal Assignments - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–6
Wiring the Conext XW+ Inverter/Charger without a PDP - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–6
Conext XW+ Inverter/Charger Grounding - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–7
Grounding the DC System - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–7
Battery Temperature Sensor Installation - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–9
Making DC Connections without a PDP - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–10
Battery Cables and Battery Terminals - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–10
Making AC Connections - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–17
AC Terminal Block - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–18
AC Equipment Grounding - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–20
AC System Bonding - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–21
AC wiring the Conext XW+ Inverter/Charger to the Inverter Load Sub-Panel - - - - - - - - 3–22
AC wiring additional Conext XW+ Inverter/Chargers without a PDP - - - - - - - - - - - - - - - - - - 3–26
Basic Functional Test – Single Inverter - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–28
Confirming All Connections - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–28
Applying DC Power to the Inverter - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–29
Enabling the Inverter - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–30
AC Voltage Check - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–32
Confirming Battery Charger Operation - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–33
Basic Functional Test - Multiple Inverters - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–35
Wiring the Conext XW+ Inverter/Charger with a PDP - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–37
Pre-Installation Steps - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–38
Conext XW+ Power Distribution Panel Internal Faceplate Removal - - - - - - - - - - - - - - - - - - 3–40
Conext XW+ Inverter/Charger Grounding - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–41
Making DC Connections with a PDP - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–41
Battery Cables and Battery Terminals - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–41
DC Grounding - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–43
Single Inverter/Charger DC Connections - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–43
Dual Inverter/Charger DC Connections - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–46
DC Grounding - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–46
DC positive bus bar installation - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–46
DC Wiring for a Dual-Inverter System - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–46
Triple Inverter/Charger DC Connections - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–48
DC Grounding - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–48
DC Positive Bus Bar installation - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–48
DC Wiring for a Triple-Inverter System - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–48
AC Wiring with a Conext XW+ Power Distribution Panel - - - - - - - - - - - - - - - - - - - - - - - - - - 3–50
AC equipment grounding - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3–50