Clearance Requirements
Provide at least 91 cm of clearance in front of the inverter, and a minimum of 15
cm of clearance at the top and bottom of the inverter for ventilation. Ensure the
vents remain unobstructed, and that the Conext XW+ Power Distribution Panel
door has adequate room to fully open.
Knockout Selection
The Conext XW+ Inverter/Charger, Conext XW+ Power Distribution Panel, and
Conext XW+ Conduit Box are equipped with nested dual knockouts for wiring
through conduits.
Figure 2-1 Example of clearance requirements for a Conext XW+ with PDP
Note: Do not drill, cut, or punch holes into the Conext XW+ Inverter/Charger or
Conext XW+ Conduit Box. Use only the knockouts provided for conduit entry.