Conext XW+ 230V Installation Guide
Table Of Contents
- Conext™ XW
- Inverter/Charger
- Conext™ XW
- Inverter/Charger
- About This Guide
- Important Safety Instructions
- Contents
- Introduction
- Overview
- Conext XW+ Features
- Optional Accessories
- Conext XW+ Conduit Box
- Conext XW+ Power Distribution Panel
- Conext XW+ Connection Kit for INV2 INV3 PDP
- Conext MPPT 60 150 Solar Charge Controller
- Conext MPPT 80 600 Solar Charge Controller
- Conext System Control Panel
- Conext Automatic Generator Start
- Conext ComBox
- Conext Battery Monitor
- Battery Fuse Disconnect Box (250A)
- Battery Fuse Disconnect Box (160A)
- Pre-Installation and Wall-Mounting
- Wiring the Conext XW+ Inverter/ Charger
- Removing the AC Access Panel and PDP Internal Faceplates
- Communication Ports and BTS Port
- Wiring the Conext XW+ Inverter/Charger without a PDP
- Basic Functional Test – Single Inverter
- Basic Functional Test - Multiple Inverters
- Wiring the Conext XW+ Inverter/Charger with a PDP
- Pre-Installation Steps
- Conext XW+ Power Distribution Panel Internal Faceplate Removal
- Conext XW+ Inverter/Charger Grounding
- Making DC Connections with a PDP
- Single Inverter/Charger DC Connections
- Dual Inverter/Charger DC Connections
- Triple Inverter/Charger DC Connections
- AC Wiring with a Conext XW+ Power Distribution Panel
- Xanbus Network Installation
- Conext XW+ Inverter/Charger Accessories Installation
- Specifications
Wiring the Conext XW+ Inverter/Charger
3–20 975-0714-01-01
This manual is for use by qualified personnel only
AC Equipment Grounding
See Table 2-4 on page 2–16 for torque values for the AC terminal and AC ground
bar. See Table 2-4 on page 2–16 for torque requirements for the ground bar in
the Conext XW+ Power Distribution Panel.
Figure 3-12 AC Equipment Grounding With the PDP
NG
L
AC INAC OU T AC IN
GRID
(AC1)
AC
LOAD
GEN
(AC2)
NLNLNL
LIVE IN
LIVE OUT
N
G
1
2
3
4
5
N
G
1. Generator disconnect
2. Primary system ground
3. Main utility panel
4. Inverter load sub-panel
5. AC generator
Grounding requirements may vary.
Cable routing may vary. See Knockout Selection
on page 2-4 and Communications Network
Preparation on page 2-12. For torque values, see
page 2-16 and 2-17.
LEGEND