Wiring the Conext XW+ Inverter/Charger
3–20 975-0714-01-01
This manual is for use by qualified personnel only
AC Equipment Grounding
See Table 2-4 on page 2–16 for torque values for the AC terminal and AC ground
bar. See Table 2-4 on page 2–16 for torque requirements for the ground bar in
the Conext XW+ Power Distribution Panel.
Figure 3-12 AC Equipment Grounding With the PDP
NG
L
AC INAC OU T AC IN
GRID
(AC1)
AC
LOAD
GEN
(AC2)
NLNLNL
LIVE IN
LIVE OUT
N
G
1
2
3
4
5
N
G
1. Generator disconnect
2. Primary system ground
3. Main utility panel
4. Inverter load sub-panel
5. AC generator
Grounding requirements may vary.
Cable routing may vary. See Knockout Selection
on page 2-4 and Communications Network
Preparation on page 2-12. For torque values, see
page 2-16 and 2-17.
LEGEND