Conext XW+ 230V Installation Guide
Table Of Contents
- Conext™ XW
- Inverter/Charger
- Conext™ XW
- Inverter/Charger
- About This Guide
- Important Safety Instructions
- Contents
- Introduction
- Overview
- Conext XW+ Features
- Optional Accessories
- Conext XW+ Conduit Box
- Conext XW+ Power Distribution Panel
- Conext XW+ Connection Kit for INV2 INV3 PDP
- Conext MPPT 60 150 Solar Charge Controller
- Conext MPPT 80 600 Solar Charge Controller
- Conext System Control Panel
- Conext Automatic Generator Start
- Conext ComBox
- Conext Battery Monitor
- Battery Fuse Disconnect Box (250A)
- Battery Fuse Disconnect Box (160A)
- Pre-Installation and Wall-Mounting
- Wiring the Conext XW+ Inverter/ Charger
- Removing the AC Access Panel and PDP Internal Faceplates
- Communication Ports and BTS Port
- Wiring the Conext XW+ Inverter/Charger without a PDP
- Basic Functional Test – Single Inverter
- Basic Functional Test - Multiple Inverters
- Wiring the Conext XW+ Inverter/Charger with a PDP
- Pre-Installation Steps
- Conext XW+ Power Distribution Panel Internal Faceplate Removal
- Conext XW+ Inverter/Charger Grounding
- Making DC Connections with a PDP
- Single Inverter/Charger DC Connections
- Dual Inverter/Charger DC Connections
- Triple Inverter/Charger DC Connections
- AC Wiring with a Conext XW+ Power Distribution Panel
- Xanbus Network Installation
- Conext XW+ Inverter/Charger Accessories Installation
- Specifications
Wiring the Conext XW+ Inverter/Charger without a PDP
975-0714-01-01 3–23
This manual is for use by qualified personnel only
Wiring Wiring for connections between the PDP and the inverter load sub-panel is not
included. See “Torque Values” on page 2–16 for torque requirements.
To install the inverter load sub-panel and AC conduit:
1. Choose a location for the inverter load sub-panel and install it according to
the manufacturer’s directions.
2. Install an AC conduit between the PDP and the inverter load sub-panel.
3. Determine which circuits the Conext XW+ Inverter/Charger will power and
install the appropriate circuit breakers into the inverter load sub-panel.
4. For on-grid systems:
a) Disconnect all power to the main AC panel (utility grid).
b) Choose which circuits will be backed by the inverter(s), and remove their
wires from the main panel.
c) Reroute these wires to the new inverter load sub-panel.
5. Remove unused breakers from utility panel.
6. Install a 60 amp maximum (disconnect) main circuit breaker in the inverter
load sub-panel.
Ensure that the AC system, including the Conext XW+ Inverter/Charger and
generator, is correctly grounded according to local electrical codes. See “AC
Equipment Grounding” on page 3–20.
To connect the Conext XW+ Inverter/Charger to the inverter load sub-panel:
1. See Figure 3-13 on page 3–24. Connect the neutral wire from the inverter
load sub-panel neutral bus to the N-LOAD terminal on the inverter.
2. Connect the L (LINE) wire from the input terminal on the inverter load
sub-panel to the AC Load (L-LOAD) terminal on the inverter.
NOTICE
BACK FED AC POWER
Back fed AC Power can damage equipment. Do not wire the inverter’s AC
output port directly to the utility line or generator output.
Failure to follow these instructions can result in damage to equipment.
Note: The instructions below are general guidelines only. AC breaker installation
may vary. Consult your system designer or qualified technician for specific
installation instructions. For more information, contact your contact your local
Schneider Electric Sales Representative.