Conext XW+ 230V Installation Guide
Table Of Contents
- Conext™ XW
- Inverter/Charger
- Conext™ XW
- Inverter/Charger
- About This Guide
- Important Safety Instructions
- Contents
- Introduction
- Overview
- Conext XW+ Features
- Optional Accessories
- Conext XW+ Conduit Box
- Conext XW+ Power Distribution Panel
- Conext XW+ Connection Kit for INV2 INV3 PDP
- Conext MPPT 60 150 Solar Charge Controller
- Conext MPPT 80 600 Solar Charge Controller
- Conext System Control Panel
- Conext Automatic Generator Start
- Conext ComBox
- Conext Battery Monitor
- Battery Fuse Disconnect Box (250A)
- Battery Fuse Disconnect Box (160A)
- Pre-Installation and Wall-Mounting
- Wiring the Conext XW+ Inverter/ Charger
- Removing the AC Access Panel and PDP Internal Faceplates
- Communication Ports and BTS Port
- Wiring the Conext XW+ Inverter/Charger without a PDP
- Basic Functional Test – Single Inverter
- Basic Functional Test - Multiple Inverters
- Wiring the Conext XW+ Inverter/Charger with a PDP
- Pre-Installation Steps
- Conext XW+ Power Distribution Panel Internal Faceplate Removal
- Conext XW+ Inverter/Charger Grounding
- Making DC Connections with a PDP
- Single Inverter/Charger DC Connections
- Dual Inverter/Charger DC Connections
- Triple Inverter/Charger DC Connections
- AC Wiring with a Conext XW+ Power Distribution Panel
- Xanbus Network Installation
- Conext XW+ Inverter/Charger Accessories Installation
- Specifications
Wiring the Conext XW+ Inverter/Charger without a PDP
975-0714-01-01 3–27
This manual is for use by qualified personnel only
To install multiple inverters:
1. Disconnect all power from the system.
2. Mount additional Conext XW+ Inverter/Chargers. See 9.
3. Install conduit and cable clamps for DC cables, AC wiring, and AC Sync
cables in accordance with local electrical codes.
4. Install Xanbus and AC Sync cables as required. See “Communications
Network Preparation” on page 2–12.
5. Install a Conext System Control Panel or ComBox. When installing more than
one inverter at a location, a Conext System Control Panel or ComBox is
required to give each inverter (and other Xanbus-enabled devices) a unique
name and to modify the factory-installed default settings to match and
support the installation.
6. Install all necessary breakers and components (not included) in the inverter
load sub-panel and the main utility panel to accommodate the additional
Conext XW+ Inverter/Chargers.
7. Connect DC wiring. (See “Battery Temperature Sensor Installation” on
page 3–9.)
8. Connect AC wiring. Ensure that your installation complies with all applicable
local installation codes.
To perform a basic functional test for a multiple inverters:
See “Basic Functional Test - Multiple Inverters” on page 3–35.
NOTICE
BACK FED AC POWER
Back fed AC Power can damage equipment. Do not wire the inverter’s AC
output port directly to the utility line or generator output.
Failure to follow these instructions can result in damage to equipment.
WARNING
UNGROUNDED EQUIPMENT
Equipment ground terminals must be reliably connected to ground by
appropriately sized grounding conductors. All installations must comply with
national and local codes. Consult local and national codes for specific
grounding and bonding requirements.
Failure to follow these instructions can result in death or serious injury.
Note: The instructions below are general guidelines only. AC breaker installation
may vary. Consult your system designer or qualified technician for specific
installation instructions. For more information, contact your contact your local
Schneider Electric Sales Representative.