Conext XW+ 230V Installation Guide
Table Of Contents
- Conext™ XW
- Inverter/Charger
- Conext™ XW
- Inverter/Charger
- About This Guide
- Important Safety Instructions
- Contents
- Introduction
- Overview
- Conext XW+ Features
- Optional Accessories
- Conext XW+ Conduit Box
- Conext XW+ Power Distribution Panel
- Conext XW+ Connection Kit for INV2 INV3 PDP
- Conext MPPT 60 150 Solar Charge Controller
- Conext MPPT 80 600 Solar Charge Controller
- Conext System Control Panel
- Conext Automatic Generator Start
- Conext ComBox
- Conext Battery Monitor
- Battery Fuse Disconnect Box (250A)
- Battery Fuse Disconnect Box (160A)
- Pre-Installation and Wall-Mounting
- Wiring the Conext XW+ Inverter/ Charger
- Removing the AC Access Panel and PDP Internal Faceplates
- Communication Ports and BTS Port
- Wiring the Conext XW+ Inverter/Charger without a PDP
- Basic Functional Test – Single Inverter
- Basic Functional Test - Multiple Inverters
- Wiring the Conext XW+ Inverter/Charger with a PDP
- Pre-Installation Steps
- Conext XW+ Power Distribution Panel Internal Faceplate Removal
- Conext XW+ Inverter/Charger Grounding
- Making DC Connections with a PDP
- Single Inverter/Charger DC Connections
- Dual Inverter/Charger DC Connections
- Triple Inverter/Charger DC Connections
- AC Wiring with a Conext XW+ Power Distribution Panel
- Xanbus Network Installation
- Conext XW+ Inverter/Charger Accessories Installation
- Specifications
Basic Functional Test – Single Inverter
975-0714-01-01 3–33
This manual is for use by qualified personnel only
Confirming Battery Charger Operation
To confirm battery charger operation:
1. Apply AC from grid or generator. LEDs will blink while the power source is
qualified.
2. Check LEDs (AC1 or AC2) on the front panel. One of them must be ON for
the unit to charge.
3. Check the amp (A) LED. If the A LED is ON, the unit is charging and the
battery current is displayed on the inverter information panel.
This completes the functional test. If any of the internal set points need to be
adjusted on the Conext XW+, consult the configuration chapter of the
Conext
XW+ Inverter/Charger Owner’s Guide.
Figure 3-20 Checking Charging Operation
Note: Unless the inverter/charger settings have been changed, the inverter will
charge as if it has a large (> 440 Ah) flooded battery bank (factory default
setting). In newly installed systems, adjust the battery charging set points to
match the batteries as installed.
Amp LED