Conext XW+ 230V Installation Guide
Table Of Contents
- Conext™ XW
- Inverter/Charger
- Conext™ XW
- Inverter/Charger
- About This Guide
- Important Safety Instructions
- Contents
- Introduction
- Overview
- Conext XW+ Features
- Optional Accessories
- Conext XW+ Conduit Box
- Conext XW+ Power Distribution Panel
- Conext XW+ Connection Kit for INV2 INV3 PDP
- Conext MPPT 60 150 Solar Charge Controller
- Conext MPPT 80 600 Solar Charge Controller
- Conext System Control Panel
- Conext Automatic Generator Start
- Conext ComBox
- Conext Battery Monitor
- Battery Fuse Disconnect Box (250A)
- Battery Fuse Disconnect Box (160A)
- Pre-Installation and Wall-Mounting
- Wiring the Conext XW+ Inverter/ Charger
- Removing the AC Access Panel and PDP Internal Faceplates
- Communication Ports and BTS Port
- Wiring the Conext XW+ Inverter/Charger without a PDP
- Basic Functional Test – Single Inverter
- Basic Functional Test - Multiple Inverters
- Wiring the Conext XW+ Inverter/Charger with a PDP
- Pre-Installation Steps
- Conext XW+ Power Distribution Panel Internal Faceplate Removal
- Conext XW+ Inverter/Charger Grounding
- Making DC Connections with a PDP
- Single Inverter/Charger DC Connections
- Dual Inverter/Charger DC Connections
- Triple Inverter/Charger DC Connections
- AC Wiring with a Conext XW+ Power Distribution Panel
- Xanbus Network Installation
- Conext XW+ Inverter/Charger Accessories Installation
- Specifications
Wiring the Conext XW+ Inverter/Charger
3–36 975-0714-01-01
This manual is for use by qualified personnel only
b) Change System Mode to Operating.
c) Press Exit until you see the System Status screen.
12. Confirm the Master inverter displays . and the Slaves displays “” on
their front panels.
13. Check for faults. If fault condition(s) exist, correct, and then restart Functional
Tes t.
14. Check voltage at AC LOAD terminals of the Master inverter.
15. Switch the AC Load breakers ON.
16. Confirm operation of connected AC loads.
17. Disconnect AC LOAD breakers.
18. Using the Conext System Control Panel, reduce maximum charge rate.
a) From the System Status screen, go to System Settings and
enable Cascading (if not enabled). With Cascading enabled, a
change to a setting in one inverter will automatically ripple through to the
other inverter(s) in the system.
b) Go to Advanced Settings > Charger Settings in one of the
inverters.
c) Set Max Chg Rate to 10%.
d) Press Exit until you see the System Status screen.
19. Switch AC input breakers ON.
Note: All inverters in the system must be connected to the same AC input
source before they will qualify the source.
20. Confirm both inverters start charging.
Note: With Max Chg Rate set to 10% the maximum charge rate is limited to
10 A on each inverter. Depending on the battery bank’s state-of-charge, the
output from one or more inverters may quickly drop to zero. This is
considered normal operation.
21. Check for faults. If fault condition(s) exist, correct, and then restart the
Functional Test.
If the Inverters pass the Functional Test, proceed to the Commissioning
procedure as defined in