Conext XW+ 230V Installation Guide
Table Of Contents
- Conext™ XW
- Inverter/Charger
- Conext™ XW
- Inverter/Charger
- About This Guide
- Important Safety Instructions
- Contents
- Introduction
- Overview
- Conext XW+ Features
- Optional Accessories
- Conext XW+ Conduit Box
- Conext XW+ Power Distribution Panel
- Conext XW+ Connection Kit for INV2 INV3 PDP
- Conext MPPT 60 150 Solar Charge Controller
- Conext MPPT 80 600 Solar Charge Controller
- Conext System Control Panel
- Conext Automatic Generator Start
- Conext ComBox
- Conext Battery Monitor
- Battery Fuse Disconnect Box (250A)
- Battery Fuse Disconnect Box (160A)
- Pre-Installation and Wall-Mounting
- Wiring the Conext XW+ Inverter/ Charger
- Removing the AC Access Panel and PDP Internal Faceplates
- Communication Ports and BTS Port
- Wiring the Conext XW+ Inverter/Charger without a PDP
- Basic Functional Test – Single Inverter
- Basic Functional Test - Multiple Inverters
- Wiring the Conext XW+ Inverter/Charger with a PDP
- Pre-Installation Steps
- Conext XW+ Power Distribution Panel Internal Faceplate Removal
- Conext XW+ Inverter/Charger Grounding
- Making DC Connections with a PDP
- Single Inverter/Charger DC Connections
- Dual Inverter/Charger DC Connections
- Triple Inverter/Charger DC Connections
- AC Wiring with a Conext XW+ Power Distribution Panel
- Xanbus Network Installation
- Conext XW+ Inverter/Charger Accessories Installation
- Specifications
Wiring the Conext XW+ Inverter/Charger
3–50 975-0714-01-01
This manual is for use by qualified personnel only
AC Wiring with a Conext XW+ Power Distribution Panel
AC equipment grounding
See “AC Equipment Grounding” on page 3–20.
AC breaker installation
The Conext XW+ Power Distribution Panel does not include AC breakers. Mount
appropriately sized and rated AC breakers onto the DIN rail inside the Conext
XW+ Power Distribution Panel; ensure that your installation is done in
accordance with all applicable local installation codes.
AC Wiring with a PDP
An inverter load sub-panel and AC conduit must be installed before your Conext
XW+ installation can be completed. For more information, see “AC wiring the
Conext XW+ Inverter/Charger to the Inverter Load Sub-Panel” on page 3–22.
Wiring Wiring for connections between the PDP and the inverter load sub-panel is not
included. See “Torque Values” on page 2–16 for torque requirements.
To connect the Conext XW+ Power Distribution Panel to the Conext XW+
Inverter/Charger(s):
1. Connect neutral wiring from the Conext XW+ Inverter/Charger neutral (N)
terminal to the neutral bus bar on the PDP.
2. Connect the Line (L) wire from each GRID breaker to the corresponding AC
Input (AC1) on the Conext XW+ unit.
3. Connect the L wire from each LOADS breaker to the corresponding AC OUT
terminal on the Conext XW+ unit.
4. Connect ground wiring from the ground bus bar on the PDP to the Conext
XW+ unit.
Note: AC breakers must be mountable on a 35mm "top hat" DIN rail (EN 50022).
Depending on your local installation codes, compatible breakers may be
available from Schneider Electric (e.g. Acti 9 Miniature Circuit Breakers). For
more information, contact your local Schneider Electric Sales Representative.
Note: AC breaker installation may vary. Ensure that your installation is done in
accordance with all applicable local installation codes. For more information,
contact your local Schneider Electric Sales Representative.
Note: The instructions below are general guidelines only. AC wiring and AC
breaker installation may vary. Consult your system designer or qualified
technician for specific installation instructions. For more information, contact your
contact your local Schneider Electric Sales Representative.