Installation guide
Installation
54
890USE17100 September 2003
4 Align the electrodes on the base with the electrode channels on the NIM and push 
the base toward the DIN rail until the interlocking channels meet. Using the 
interlocking channels as guides, slide the base toward the DIN rail (push from the 
center of the base). When the base meets the DIN rail hold the base unit firmly 
against the DIN rail and push the DIN rail latch into the locked position. 
5 Working from your installation plan, select the correct base unit for the module that 
will be located directly to the right of the previous base unit, and repeat steps 2 ...5
6 Repeat steps 2 ... 4 until base units for all the I/O and PDM modules in the primary 
segment are installed. 
7 Refer to the procedures in the next section for information on installing the last 
device in the segment.
Step Action










