Installation guide
Commissioning
890USE17100 September 2003 93
If we remove an optional module that resides to the right of any and all mandatory 
modules, as shown below, 
the island will behave the same way as it would if all the modules were optional— 
all of the existing modules would continue to be operational. Now, If the reset button 
is pushed your configuration will be erased and modules 1 through 4 will be default 
configured—all optional. If you power cycle instead of pushing the reset button, all 
the existing modules, except for the module in position 6, will be operational again 
and module 4 will continue to be configured as mandatory: 
The island behavior changes, however, if an optional module to the left of a 
mandatory module is removed.
12 4
5
6
X
MOOO O O
3
12 4
5
6
X
MOOO O O
3
X
RST










