Specifications

© 2012 Schneider Electric (Australia)
PICED FAQ
Page 20
Solution
The C-Touch start-up sequence is shown in the diagram below :
The start-up steps are as follows :
1. On power-up or reset, the Monitor starts running.
2. The Monitor initialises the C-Touch hardware.
3. The Monitor then checks the Application checksum.
4. If the Application checksum is OK, it then loads the Application, and you will hear it beep.
5. If the Application checksum is not OK, you will hear it ticking, which indicates that the Monitor
is still running.
6. The Application displays an "Initialising" message.
7. The Application initialises the C-Bus interface. If this is unsuccessful, it will reset the unit.
8. The Application then checks the User Configuration Data checksum.
9. If the User Configuration Data checksum is OK, it then loads the data, and runs it. You will see
the start-up screen.
10. If the User Configuration Data checksum fails, it displays an error message saying that the
C-Touch needs to be programmed before use.