Installation Guide

Table Of Contents
Wiring Additional Conext XW+ units with a PDP
975-0239-01-01 Rev G 3–53
This manual is for use by qualified personnel only
Figure 3-30 Wiring an External Bypass Switch for a Triple-Inverter Configuration
NG
L1 L2
1
7
8
4
5
6
2
3
L2L1
1. Inverter load sub-panel
2. Bypass switch
3. Main utility panel
4. AC generator
5. Generator disconnect
6. From inverter output breakers in
the Conext XW+ Power Distribution
Panel (PDP)
7. To GRID (AC1) Input breakers in
PDP
8. To GEN (AC2) Input breakers in
PDP
Actual wiring requirements may vary.