Installation Guide
Table Of Contents
- Conext™ XW+ Inverter/Charger Installation Guide
- Conext™ XW+ Inverter/Charger Installation Guide
- About This Guide
- Important Safety Instructions
- Contents
- Introduction
- Overview
- Optional Accessories
- Conext XW+ Conduit Box
- Conext XW+ Power Distribution Panel
- Conext XW+ Connection Kit for INV2 INV3 PDP
- Conext 120/240VAC Breaker Kit for Conext XW+ PDP
- Conext MPPT 60 150 Solar Charge Controller
- Conext MPPT 80 600 Solar Charge Controller
- Conext System Control Panel
- Conext Automatic Generator Start
- Conext ComBox
- Conext Battery Monitor
- Conext 3 Phase Breaker Kit for Conext XW+ PDP
- 100A, 125VDC Breaker Master Pack (12 units)
- 80A, 125VDC Breaker Master Pack (12 units)
- 60A, 160VDC Breaker Master Pack (48 units)
- 250A, 160VDC Breaker Master Pack (6 units)
- Pre-Installation and Wall-Mounting
- Wiring the Conext XW+ Inverter/ Charger and Conext XW+ Power Distribution Panel
- Removing the AC Access Panel and PDP Internal Faceplates
- Communication Ports and BTS Port
- Wiring the Conext XW+ Inverter/Charger with a PDP
- Basic Functional Test – Single Inverter
- Wiring Additional Conext XW+ units with a PDP
- Basic Functional Test - Multiple Inverters
- Wiring a Balanced Three-Phase System
- Wiring the Conext XW+ Inverter/Charger without a PDP
- Xanbus Network Installation
- Conext XW+ Inverter/Charger Accessories Installation
- Specifications
- Wiring Diagrams
- Split-Phase to Single-Phase Conversion Instructions
Wiring a Balanced Three-Phase System
975-0239-01-01 Rev G 3–63
This manual is for use by qualified personnel only
Breaker Installation
1. Remove all connections to the utility grid, generator, inverter load sub-panel,
and Conext XW+ Inverter/Charger.
2. Remove the pre-installed breakers from the PDP, and mount the 3-pole, 60 A,
120/208 VAC breakers (included in the Conext 3 Phase Breaker Kit) onto the
DIN rail.
Figure 3-31 Three-Phase DC Wiring
AC INAC OUT AC IN
GRID
(AC1)
AC
LOAD
GEN
(AC2)
NL1L2NL1L2NL1 L2
AC INAC OUT AC IN
GRID
(AC1)
AC
LOAD
GEN
(AC2)
NL1L2NL1L2NL1 L2
NL1L2NL1L2NL1 L2
AC IN
GRID
AC OUT
INV
OUT
AC IN
GEN
G
RI
D
BYPASS
G
EN
1
1. Vented battery enclosure Actual wiring requirements may vary.
Cable routing may vary. See Knockout Selection
on page 2-5 and Communications Network
Preparation on page 2-12.
For torque values, see page 2-16 and 2-17.
LEGEND
Positive (+)
Battery cable
Negative (–)
Battery cable
BTS cable
Grounding
conductor
INV1INV2INV3