Installation Guide

Table Of Contents
B–4 975-0239-01-01 Rev G
This manual is for use by qualified personnel only
Single-Inverter System (Backup Only) With a Conext XW+ Power Distribution Panel
Figure B-2 Single-Inverter System (Backup Only) With a Conext XW+ Power Distribution Panel
NL1L2NL1L2NL1 L2
AC IN
GRID
(AC1)
AC OUT
INV
OUT
AC IN
GEN
(AC2)
Standby
Event/Warning
Conext XW SCP
NG
L1 L2
L2
L1
1
2
3 4
1
2 4
5 7
8
3
6
5
7
6
8
8
SCP (optional) AGS (optional)
Main utility panel
Inverter load sub-panel
AC generator
Generator disconnect
AC Sync cable
Ground
Xanbus cable
Hot L1
Hot L2
Neutral
DC disconnect
LEGEND
AC breakers
Network ter minator
Battery bank
Positive (+)
battery terminal
Negative (-)
battery terminal
Actual wiring requirements may vary.
Cable routing may vary.
See Knockout Selection on page 2-5 and Communications Network Preparation on page
2-12.
For torque values, see page 2-16 and 2-17.
For torque connections to the battery terminals, consult the battery manufacturer’s
recommendations.
Positive (+)
battery cable
Negative (-)
battery cable
BTS cable