Installation Guide

Table Of Contents
Converting 120 V/240 V Split-Phase to 120 V Single-Phase
975-0239-01-01 Rev G C–3
This manual is for use by qualified personnel only
Contact Customer Service for further assistance. Please be prepared to describe
details of your system installation and provide the model and serial number of the
unit. See page ii for contact information.
Installation Tools and Materials
To complete the conversion, you will need the following:
a Phillips #2 screwdriver
one small jumper and three large jumpers, included with the Conext XW+
Inverter/Charger (See Figure C-1.)
DANGER
HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
• Battery Circuit Breakers must be installed according to the specifications
and requirements defined by Schneider Electric.
• Servicing of batteries must only be performed by qualified personnel
knowledgeable of batteries and the required precautions. Keep unqualified
personnel away from batteries.
• Disconnect the charging source prior to connecting or disconnecting battery
terminals.
Failure to follow these instructions will result in death or serious injury.
Note: To complete the conversion, you must refer to instructions in the Conext
Configuration Tool User’s Guide (Document Part Number 975-0365-01-01)
available from www.schneider-electric.com.
Note: To set up a three-phase system using three 120 V-configured Conext XW+
units, perform the conversion procedure for all three Conext XW+ Inverter/
Chargers.
Figure C-1 Conext XW Jumpers