Installation Guide
Table Of Contents
- Conext™ XW+ Inverter/Charger Installation Guide
- Conext™ XW+ Inverter/Charger Installation Guide
- About This Guide
- Important Safety Instructions
- Contents
- Introduction
- Overview
- Optional Accessories
- Conext XW+ Conduit Box
- Conext XW+ Power Distribution Panel
- Conext XW+ Connection Kit for INV2 INV3 PDP
- Conext 120/240VAC Breaker Kit for Conext XW+ PDP
- Conext MPPT 60 150 Solar Charge Controller
- Conext MPPT 80 600 Solar Charge Controller
- Conext System Control Panel
- Conext Automatic Generator Start
- Conext ComBox
- Conext Battery Monitor
- Conext 3 Phase Breaker Kit for Conext XW+ PDP
- 100A, 125VDC Breaker Master Pack (12 units)
- 80A, 125VDC Breaker Master Pack (12 units)
- 60A, 160VDC Breaker Master Pack (48 units)
- 250A, 160VDC Breaker Master Pack (6 units)
- Pre-Installation and Wall-Mounting
- Wiring the Conext XW+ Inverter/ Charger and Conext XW+ Power Distribution Panel
- Removing the AC Access Panel and PDP Internal Faceplates
- Communication Ports and BTS Port
- Wiring the Conext XW+ Inverter/Charger with a PDP
- Basic Functional Test – Single Inverter
- Wiring Additional Conext XW+ units with a PDP
- Basic Functional Test - Multiple Inverters
- Wiring a Balanced Three-Phase System
- Wiring the Conext XW+ Inverter/Charger without a PDP
- Xanbus Network Installation
- Conext XW+ Inverter/Charger Accessories Installation
- Specifications
- Wiring Diagrams
- Split-Phase to Single-Phase Conversion Instructions
Split-Phase to Single-Phase Conversion Instructions
C–8 975-0239-01-01 Rev G
This manual is for use by qualified personnel only
Figure C-4 Slot Locations on X1 and X2 Connectors
Figure C-5 X1 and X2 Connectors Before and After Reconfiguration
Slot X2-A
Slot X2-B
Slot X3-B
Slot X3-A
Secondary transformer wire X1, X2, X3, and
X4 locations BEFORE reconfiguration
X1
X2
X3
X4
Secondary transformer wire X1, X2, X3, and X4
locations AFTER reconfiguration
X1
X2
X3
X4
Jumper