Installation Guide
Table Of Contents
- Conext™ XW+ Inverter/Charger Installation Guide
- Conext™ XW+ Inverter/Charger Installation Guide
- About This Guide
- Important Safety Instructions
- Contents
- Introduction
- Overview
- Optional Accessories
- Conext XW+ Conduit Box
- Conext XW+ Power Distribution Panel
- Conext XW+ Connection Kit for INV2 INV3 PDP
- Conext 120/240VAC Breaker Kit for Conext XW+ PDP
- Conext MPPT 60 150 Solar Charge Controller
- Conext MPPT 80 600 Solar Charge Controller
- Conext System Control Panel
- Conext Automatic Generator Start
- Conext ComBox
- Conext Battery Monitor
- Conext 3 Phase Breaker Kit for Conext XW+ PDP
- 100A, 125VDC Breaker Master Pack (12 units)
- 80A, 125VDC Breaker Master Pack (12 units)
- 60A, 160VDC Breaker Master Pack (48 units)
- 250A, 160VDC Breaker Master Pack (6 units)
- Pre-Installation and Wall-Mounting
- Wiring the Conext XW+ Inverter/ Charger and Conext XW+ Power Distribution Panel
- Removing the AC Access Panel and PDP Internal Faceplates
- Communication Ports and BTS Port
- Wiring the Conext XW+ Inverter/Charger with a PDP
- Basic Functional Test – Single Inverter
- Wiring Additional Conext XW+ units with a PDP
- Basic Functional Test - Multiple Inverters
- Wiring a Balanced Three-Phase System
- Wiring the Conext XW+ Inverter/Charger without a PDP
- Xanbus Network Installation
- Conext XW+ Inverter/Charger Accessories Installation
- Specifications
- Wiring Diagrams
- Split-Phase to Single-Phase Conversion Instructions
Converting 120 V/240 V Split-Phase to 120 V Single-Phase
975-0239-01-01 Rev G C–9
This manual is for use by qualified personnel only
Reconfiguring the AC Ports on the Load, AC1, and AC2 Connectors
To reconfigure the AC ports on the Load, AC1 (Grid), and AC2 (Gen)
connectors:
1. Locate the Load, AC1 (Grid), and AC2 (Gen) connectors (see Figure C-3 on
page C–7).
2. Insert one large jumper in each connector to short out N and L2, as shown in
Figure C-6.
3. Connect the AC cables as shown in Figure C-6. Insert jumper on top of the
wire.
4. Tighten all terminals per the torque information printed on the AC board.
See Figure C-3 on page C–7 for the torque information location.
5. Reconnect the DC sources (for example, batteries) by turning on the
DC breaker.
Figure C-6 Jumper Locations and AC Cable Configuration on AC Ports
Load
AC1 (Grid) AC2 (Gen)