Installation Guide
Table Of Contents
- Conext™ XW+ Inverter/Charger Installation Guide
- Conext™ XW+ Inverter/Charger Installation Guide
- About This Guide
- Important Safety Instructions
- Contents
- Introduction
- Overview
- Optional Accessories
- Conext XW+ Conduit Box
- Conext XW+ Power Distribution Panel
- Conext XW+ Connection Kit for INV2 INV3 PDP
- Conext 120/240VAC Breaker Kit for Conext XW+ PDP
- Conext MPPT 60 150 Solar Charge Controller
- Conext MPPT 80 600 Solar Charge Controller
- Conext System Control Panel
- Conext Automatic Generator Start
- Conext ComBox
- Conext Battery Monitor
- Conext 3 Phase Breaker Kit for Conext XW+ PDP
- 100A, 125VDC Breaker Master Pack (12 units)
- 80A, 125VDC Breaker Master Pack (12 units)
- 60A, 160VDC Breaker Master Pack (48 units)
- 250A, 160VDC Breaker Master Pack (6 units)
- Pre-Installation and Wall-Mounting
- Wiring the Conext XW+ Inverter/ Charger and Conext XW+ Power Distribution Panel
- Removing the AC Access Panel and PDP Internal Faceplates
- Communication Ports and BTS Port
- Wiring the Conext XW+ Inverter/Charger with a PDP
- Basic Functional Test – Single Inverter
- Wiring Additional Conext XW+ units with a PDP
- Basic Functional Test - Multiple Inverters
- Wiring a Balanced Three-Phase System
- Wiring the Conext XW+ Inverter/Charger without a PDP
- Xanbus Network Installation
- Conext XW+ Inverter/Charger Accessories Installation
- Specifications
- Wiring Diagrams
- Split-Phase to Single-Phase Conversion Instructions
Wiring the Conext XW+ Inverter/Charger and Conext XW+ Power Distribution Panel
3–10 975-0239-01-01 Rev G
This manual is for use by qualified personnel only
Battery Temperature Sensor Installation
The Battery Temperature Sensor (BTS) regulates battery charging based on
battery temperature. The BTS extends battery life by minimizing overcharging in
warm temperatures and undercharging in cold temperatures.
The BTS connects to the Conext XW+ via the BTS port, which is located at the
bottom of the Conext XW+ chassis, next to the communication ports.
To install the Battery Temperature Sensor:
1. Route the BTS cable through your preferred conduit route and insert the BTS
jack into the BTS port.
2. Route the BTS cable to the battery enclosure, and then connect the BTS
using one of the following methods (as shown in Figure 3-6 on page 3–11):
a) Connect the BTS ring terminal directly to a battery terminal
(recommended), or:
b) Attach the BTS to any side of the battery you wish to monitor by using the
adhesive backing on the BTS.
WARNING
BATTERY TEMPERATURE
The Battery Temperature Sensor provides necessary information for
performance and safety.
Always install and connect the Battery Temperature Sensor (BTS).
Failure to follow these instructions can result in death or serious injury.
Note: Connect the BTS to the batteries only after the battery bank has been
prepared and is ready to connect to the inverter.
Note: When using the adhesive backing, install the BTS on the side of the battery
below the electrolyte level.