Installation Guide
Table Of Contents
- Conext™ XW+ Inverter/Charger Installation Guide
- Conext™ XW+ Inverter/Charger Installation Guide
- About This Guide
- Important Safety Instructions
- Contents
- Introduction
- Overview
- Optional Accessories
- Conext XW+ Conduit Box
- Conext XW+ Power Distribution Panel
- Conext XW+ Connection Kit for INV2 INV3 PDP
- Conext 120/240VAC Breaker Kit for Conext XW+ PDP
- Conext MPPT 60 150 Solar Charge Controller
- Conext MPPT 80 600 Solar Charge Controller
- Conext System Control Panel
- Conext Automatic Generator Start
- Conext ComBox
- Conext Battery Monitor
- Conext 3 Phase Breaker Kit for Conext XW+ PDP
- 100A, 125VDC Breaker Master Pack (12 units)
- 80A, 125VDC Breaker Master Pack (12 units)
- 60A, 160VDC Breaker Master Pack (48 units)
- 250A, 160VDC Breaker Master Pack (6 units)
- Pre-Installation and Wall-Mounting
- Wiring the Conext XW+ Inverter/ Charger and Conext XW+ Power Distribution Panel
- Removing the AC Access Panel and PDP Internal Faceplates
- Communication Ports and BTS Port
- Wiring the Conext XW+ Inverter/Charger with a PDP
- Basic Functional Test – Single Inverter
- Wiring Additional Conext XW+ units with a PDP
- Basic Functional Test - Multiple Inverters
- Wiring a Balanced Three-Phase System
- Wiring the Conext XW+ Inverter/Charger without a PDP
- Xanbus Network Installation
- Conext XW+ Inverter/Charger Accessories Installation
- Specifications
- Wiring Diagrams
- Split-Phase to Single-Phase Conversion Instructions
Wiring the Conext XW+ Inverter/Charger with a PDP
975-0239-01-01 Rev G 3–19
This manual is for use by qualified personnel only
To access the AC terminal block, you will need to remove the AC access panel.
For more information, see “Removing the AC Access Panel and PDP Internal
Faceplates” on page 3–2.
The AC terminal block includes three terminals each (L1, L2, and Neutral) for AC
Grid input (AC1), AC Generator input (AC2), and AC Out (AC LOAD)
connections. (see Figure 3-10 on page 3–19.)
The neutral inputs are connected to each other, requiring only one neutral
connection when installed with a Conext XW+ Power Distribution Panel. Without
the PDP, additional neutral connections may be required at the input sources.
DANGER
HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
• Battery Circuit Breakers must be installed according to the specifications
and requirements defined by Schneider Electric.
• Servicing of batteries must only be performed by qualified personnel
knowledgeable of batteries and the required precautions. Keep unqualified
personnel away from batteries.
• Disconnect the charging source prior to connecting or disconnecting battery
terminals.
Failure to follow these instructions will result in death or serious injury.
Figure 3-10 AC terminal block
AC INAC OUT AC IN
GRID
(AC1)
AC
LOAD
GEN
(AC2)
NL1L2NL1L2NL1 L2
AC INAC OUT AC IN
GRID
(AC1)
AC
LOAD
GEN
(AC2)
NL1L2NL1L2NL1 L2