Installation Guide
Table Of Contents
- Conext™ XW+ Inverter/Charger Installation Guide
- Conext™ XW+ Inverter/Charger Installation Guide
- About This Guide
- Important Safety Instructions
- Contents
- Introduction
- Overview
- Optional Accessories
- Conext XW+ Conduit Box
- Conext XW+ Power Distribution Panel
- Conext XW+ Connection Kit for INV2 INV3 PDP
- Conext 120/240VAC Breaker Kit for Conext XW+ PDP
- Conext MPPT 60 150 Solar Charge Controller
- Conext MPPT 80 600 Solar Charge Controller
- Conext System Control Panel
- Conext Automatic Generator Start
- Conext ComBox
- Conext Battery Monitor
- Conext 3 Phase Breaker Kit for Conext XW+ PDP
- 100A, 125VDC Breaker Master Pack (12 units)
- 80A, 125VDC Breaker Master Pack (12 units)
- 60A, 160VDC Breaker Master Pack (48 units)
- 250A, 160VDC Breaker Master Pack (6 units)
- Pre-Installation and Wall-Mounting
- Wiring the Conext XW+ Inverter/ Charger and Conext XW+ Power Distribution Panel
- Removing the AC Access Panel and PDP Internal Faceplates
- Communication Ports and BTS Port
- Wiring the Conext XW+ Inverter/Charger with a PDP
- Basic Functional Test – Single Inverter
- Wiring Additional Conext XW+ units with a PDP
- Basic Functional Test - Multiple Inverters
- Wiring a Balanced Three-Phase System
- Wiring the Conext XW+ Inverter/Charger without a PDP
- Xanbus Network Installation
- Conext XW+ Inverter/Charger Accessories Installation
- Specifications
- Wiring Diagrams
- Split-Phase to Single-Phase Conversion Instructions
Wiring the Conext XW+ Inverter/Charger and Conext XW+ Power Distribution Panel
3–40 975-0239-01-01 Rev G
This manual is for use by qualified personnel only
Conext XW+ Inverter/Charger Grounding
The Conext XW+ is provided with ground terminals that must be reliably
connected to ground (protective earth) by appropriately sized equipment
grounding conductors. System grounding for the AC and DC systems must be
done according to all applicable NEC and local installation codes.
For more information about system grounding, see “Grounding the DC System”
on page 3–8 and “AC Equipment Grounding” on page 3–20.
Dual Inverter/Charger Installation
This section provides instructions for adding a second Conext XW+ to your
installation. Complete the following installation steps only after you have already
connected the PDP to the first Conext XW+, as shown in “Wiring the Conext XW+
Inverter/Charger with a PDP” on page 3–7.
DC Grounding
See “Grounding the DC System” on page 3–8.
DC positive bus bar installation
1. Remove the existing bus bar from the bottom terminal of the GJ250A 160
VDC, 3/8" DC disconnect/breaker (pre-installed in the PDP).
2. Install a second GJ250A - DC rated breaker (included with the Conext XW+
Connection Kit for INV2 INV3 PDP) next to the existing DC disconnect/
breaker.
3. Install the DC positive bus bar included with the Conext XW+ Connection Kit
for INV2 INV3 PDP. (This DC positive bus bar supports up to three GJ250A -
DC rated breakers.)
4. Remove the appropriate knockout from the Conext XW+ Power Distribution
Panel lower faceplate.
WARNING
UNGROUNDED EQUIPMENT
Equipment ground terminals must be reliably connected to ground by
appropriately sized grounding conductors. All installations must comply with
national and local codes. Consult local and national codes for specific
grounding and bonding requirements.
Failure to follow these instructions can result in death or serious injury.
Note: Replace faceplates after all AC and DC wiring is complete.