Installation Guide
Table Of Contents
- Conext™ XW+ Inverter/Charger Installation Guide
- Conext™ XW+ Inverter/Charger Installation Guide
- About This Guide
- Important Safety Instructions
- Contents
- Introduction
- Overview
- Optional Accessories
- Conext XW+ Conduit Box
- Conext XW+ Power Distribution Panel
- Conext XW+ Connection Kit for INV2 INV3 PDP
- Conext 120/240VAC Breaker Kit for Conext XW+ PDP
- Conext MPPT 60 150 Solar Charge Controller
- Conext MPPT 80 600 Solar Charge Controller
- Conext System Control Panel
- Conext Automatic Generator Start
- Conext ComBox
- Conext Battery Monitor
- Conext 3 Phase Breaker Kit for Conext XW+ PDP
- 100A, 125VDC Breaker Master Pack (12 units)
- 80A, 125VDC Breaker Master Pack (12 units)
- 60A, 160VDC Breaker Master Pack (48 units)
- 250A, 160VDC Breaker Master Pack (6 units)
- Pre-Installation and Wall-Mounting
- Wiring the Conext XW+ Inverter/ Charger and Conext XW+ Power Distribution Panel
- Removing the AC Access Panel and PDP Internal Faceplates
- Communication Ports and BTS Port
- Wiring the Conext XW+ Inverter/Charger with a PDP
- Basic Functional Test – Single Inverter
- Wiring Additional Conext XW+ units with a PDP
- Basic Functional Test - Multiple Inverters
- Wiring a Balanced Three-Phase System
- Wiring the Conext XW+ Inverter/Charger without a PDP
- Xanbus Network Installation
- Conext XW+ Inverter/Charger Accessories Installation
- Specifications
- Wiring Diagrams
- Split-Phase to Single-Phase Conversion Instructions
Wiring the Conext XW+ Inverter/Charger and Conext XW+ Power Distribution Panel
3–44 975-0239-01-01 Rev G
This manual is for use by qualified personnel only
5. Attach the four, four-tab jumpers (included in the Conext XW+ Connection Kit
for INV2 INV3 PDP) to top and bottom of AC breakers as shown in Figure
3-24.
AC Wiring for a Dual-Inverter System
1. Connect the grid wiring and inverter load sub-panel wiring to the new
jumpers as shown in Figure 3-25 on page 3–45.
2. Connect INV1 LOAD (INV1 L1-LOAD, INV1 L2-LOAD), INV2 LOAD (INV2
L1-LOAD, INV2 L2-LOAD), and INV2 GRID (INV2 L1-GRID, INV2 L2-GRID)
wires to AC breakers as shown in Figure 3-25 on page 3–45.
3. Connect neutral (INV2 N-LOAD) and ground (INV2 GROUND) wiring as
shown in Figure 3-25 on page 3–45.
4. Remove the knockouts on the upper faceplate of the PDP to accommodate
additional breakers.
5. Re-label the AC breakers with the appropriate labels, included with the
Conext XW+ Power Distribution Panel.
6. Install the custom designed bypass interlock plate, as shown in Figure 3-26
on page 3–46.
Figure 3-24 Dual Inverter AC Breaker Arrangement with Multiple AC Input Sources
Note: If a backup generator or other secondary AC source is installed in the
system, reuse two of the dual-tab jumpers previously installed on INV1 Grid/
Bypass breakers for generator breakers.
1
2
7
65 98
3
4
From main AC distribution panel
IMPORTANT: Install L1 PDB in first
Grid breaker slot facing FRONT.
Failure to do so will result in overlap
of terminals on L1 and L2 PDBs and
potential for shorting to occur.
From AC Load on INV1
From AC Load on INV2
From generator disconnect
IMPORTANT: Install L1 PDB in first
Gen breaker slot facing REAR.
To AC1 on INV1
To AC1on INV2
To inverter AC distribution panel
IMPORTANT: Install L1 PDB in first
Bypass breaker slot facing REAR.
To AC2 on INV1
To AC2 on INV2
1. From main utility panel
NOTE: Install L1 power distribution
2. From AC Load on INV1
3. From AC Load on INV2
4. From generator disconnect
NOTE: Install L1 jumper in first
Gen breaker slot facing REAR.
5. To AC1 on INV1
6. To AC1 on INV2
7. To inverter load sub-panel
NOTE: Install L1 jumper in first
Bypass breaker slot facing REAR.
8. To AC2 on INV1
9. To AC2 on INV2
bar (jumper) in first Grid breaker slot
facing FRONT.
INV1 IN INV2 IN INV1 IN
INV2 IN
INV1 OUT INV2 OUTGRID GRID
(GRID) (GRID) BYPASS BYPASS AC LOADS AC LOADS GEN GEN