Installation Guide
Table Of Contents
- Conext™ XW+ Inverter/Charger Installation Guide
- Conext™ XW+ Inverter/Charger Installation Guide
- About This Guide
- Important Safety Instructions
- Contents
- Introduction
- Overview
- Optional Accessories
- Conext XW+ Conduit Box
- Conext XW+ Power Distribution Panel
- Conext XW+ Connection Kit for INV2 INV3 PDP
- Conext 120/240VAC Breaker Kit for Conext XW+ PDP
- Conext MPPT 60 150 Solar Charge Controller
- Conext MPPT 80 600 Solar Charge Controller
- Conext System Control Panel
- Conext Automatic Generator Start
- Conext ComBox
- Conext Battery Monitor
- Conext 3 Phase Breaker Kit for Conext XW+ PDP
- 100A, 125VDC Breaker Master Pack (12 units)
- 80A, 125VDC Breaker Master Pack (12 units)
- 60A, 160VDC Breaker Master Pack (48 units)
- 250A, 160VDC Breaker Master Pack (6 units)
- Pre-Installation and Wall-Mounting
- Wiring the Conext XW+ Inverter/ Charger and Conext XW+ Power Distribution Panel
- Removing the AC Access Panel and PDP Internal Faceplates
- Communication Ports and BTS Port
- Wiring the Conext XW+ Inverter/Charger with a PDP
- Basic Functional Test – Single Inverter
- Wiring Additional Conext XW+ units with a PDP
- Basic Functional Test - Multiple Inverters
- Wiring a Balanced Three-Phase System
- Wiring the Conext XW+ Inverter/Charger without a PDP
- Xanbus Network Installation
- Conext XW+ Inverter/Charger Accessories Installation
- Specifications
- Wiring Diagrams
- Split-Phase to Single-Phase Conversion Instructions
Wiring Additional Conext XW+ units with a PDP
975-0239-01-01 Rev G 3–49
This manual is for use by qualified personnel only
Power Distribution Jumper Preparation (for Triple-Inverter System Only)
Each Conext XW+ Connection Kit for INV2 INV3 PDP includes four, four-tab
power distribution jumpers. In a triple-inverter system, only three tabs per jumper
are needed.
Depending on your installation, you will need either:
• Four jumpers for an installation with a single AC source (AC1 or AC2), or
• Six jumpers for an installation with two AC sources(AC1 and AC2).
Figure 3-27 DC Connections for a Triple-Inverter System
AC INAC OUT AC IN
GRID
(AC1)
AC
LOAD
GEN
(AC2)
NL1L2NL1L2NL1 L2
AC INAC OUT AC IN
GRID
(AC1)
AC
LOAD
GEN
(AC2)
NL1L2NL1L2NL1 L2
NL1L2NL1L2NL1 L2
AC IN
GRID
AC OUT
INV
OUT
AC IN
GEN
1
1. Vented battery enclosure Actual wiring requirements may vary.
Cable routing may vary. See Knockout Selection
on page 2-5 and Communications Network
Preparation on page 2-12.
For torque values, see page 2-16 and 2-17.
LEGEND
Positive (+)
Battery cable
Negative (–)
Battery cable
BTS cable
INV1INV2INV3
Grounding
conductor