Installation
Once the design phase is complete, installation may begin. Several simple steps are typically followed to achieve a fast and accurate
installation of the C-Bus
TM
network control system.
1. Implementing programming requirements of the design on a PC. Build a database using C-Bus software that includes all the
C-Bus units used in the lighting control system. Each unit is assigned a unit address.
2. Using the PC and a PC Interface, initialize and program each C-Bus device one at a time. Each device is assigned a unit address.
3. Packaging, cabling and electrical installation of the hardware.
4. Finalization and additional programming of C-Bus devices as required.
Commissioning
Verify compliance with the specication and commission the system. A design review may be performed at this point in the process.
Modications or design changes seldom require installation of additional hardware, typically requiring only programming changes.
Completed Project Layout
Finished Design