Installation manual
Installation
3–4 152936
This manual is for use by qualified personnel only.
Moving with a Crane
Ensure you dismantle the top for transport.
To move the Xantrex GT250 E with a crane:
1. Attach the crane to the four anchor points on the track.
2. Pay attention to the balance point (center of gravity) sticker.
3. Lift the Enclosure into position.
4. Remove the tracks before operating the Xantrex GT250 E.
Figure 3-2 Forklift Lifting Locations - Underneath Unit
Figure 3-3 Lifting Using a Crane
Important: Before proceeding with the installation, determine the location and
layout of the components, conduit penetration locations, conductor and conduit
sizing, and method for anchoring the unit. Ensure adequate space is provided
for clearance for ventilation and serviceability. Review Chapter 2, “Planning” if
necessary before proceeding.