- Introduction
- Planning
- Installation
- Verification and Commissioning
- Specifications
- Commissioning Test Record

Safety
xii 152364
This manual is for use by qualified personnel only.
De-Energize/Isolation Procedure
The following procedure should be followed to de-energize the Xantrex GT100 E
for maintenance.
To isolate the Xantrex GT100 E:
1. Turn the
ON/OFF switch to the OFF position.
2. Place the Emergency switch in the active position (push in).
3. Open the AC interface disconnect switch.
4. Open, lockout, and tag the PV input circuit breaker at the PV array.
5. Open, lockout, and tag the AC Grid power circuit breaker at the Grid
transformer.
Interconnection Standards Compliance
The Xantrex GT100 E complies with the German grid protection requirements of
VDEW and the Spanish RD 661/2007.
The Xantrex GT100 E is designed to meet EN50178 and EN60204-1
specifications.
Refer to both documents for details of these recommendations and test
procedures.
Intended Use
The Xantrex GT100 E may only be used in connection with PV modules. It is not
suitable for any other application areas.
An initial operation (e.g. starting the intended operation) will only be allowed
when observing the EMC guideline (89/336/EWG).
The Xantrex GT100 E complies with the 73/23/EWG low voltage directive
requirements. The harmonized standards of the series EN 50178/DIN VDE 0160
in connection with EN 60439-1/DIN VDE 0660 part 500 and EN 60146/DIN VDE
0558 will be used for the inverters.
WARNING: Shock hazard
The terminals of the DC input may be energized if the PV arrays are energized. In
addition, allow 5 minutes for all capacitors within the main enclosure to discharge
after disconnecting the Xantrex GT100 E from AC and DC sources.