Installation manual
Table Of Contents
- Xantrex™ GT100 E 100 kW Grid-Tied Photovoltaic Inverter
- Xantrex GT100 E 100 kW Grid-Tied Photovoltaic Inverter
- Copyright and Contact
- About This Manual
- Important Safety Instructions
- Contents
- Figures
- Tables
- Introduction
- Planning
- Installation
- Verification and Commissioning
- Specifications
- Commissioning Test Record

Communication Features and Methods
152364 1–9
This manual is for use by qualified personnel only.
Data Logging
The inverter stores data values and software metrics for debugging. These
values are stored within the CCU2 controller board in non-volatile memory. Data
logging requires the use of a PC connection using the PV View.
The Data Logging features include:
• Operational Values
• Internal Metrics
• Data Log Acquisition
• Graphic Data Analysis
• Fault Log Acquisition
• Software Upgrade
• Accumulated Values
• Configurable Parameters
PC Connection Methods
Personal computers can be used to access the system status, control and
programming features of the Xantrex GT100 E. Computers can be connected
either directly or remotely using the appropriate optional hardware and software.
Software is available to provide a graphic user interface that relates important
system information. This software is called the PV View GUI.
Direct Access Connection
The Xantrex GT100 E can be directly accessed by a computer using the local
communication access port.
Remote Access Connection
The Xantrex GT100 E can be remotely accessed through several methods such
as a telephone connection or local area network (LAN), wireless modem or fax
modem. Optional hardware and software is needed for these features; they are
available for purchase for use with the Xantrex GT100 E to enhance its
communications capability. The additional Xantrex GT100 E options can be field
installed. Contact a Schneider Electric distributor for further information on
installation options.