Installation manual

Table Of Contents
Installation
3–2 152364
This manual is for use by qualified personnel only.
Unloading
Moving the Shipping Crate and Xantrex GT100 E
To move the Xantrex GT100 E while it is still inside the shipping crate:
1. Place the forks of the forklift below the shipping crate at the points specified
in Figure 3-1.
2. Lift the Xantrex GT100 E from beneath the shipping crate.
Be sure to use a forklift with a sufficiently spaced fork span.
WARNING: Heavy equipment
The Xantrex GT100 E weighs 870 kg. Attempting to lift the equipment by other
than the recommended lifting points may damage the equipment or present a
personnel safety hazard and void the warranty. Keep the doors closed and
latched when moving the inverter enclosures. Leaving the door latches
unsecured may result in damage to the unit and void the warranty.
Important: Before proceeding with the installation, determine the location and
layout of the components, conduit penetration locations, conductor and conduit
sizing, and method for anchoring the unit. Ensure adequate space is provided
for clearance for ventilation and serviceability. Review Chapter 2, “Planning” if
necessary before proceeding.
Figure 3-1 Forklift Lifting Locations - Underneath Pallet