Installation
3–12 152364
This manual is for use by qualified personnel only.
Cable Installation (Optional)
Auxiliary Fan Power Connection
To connect power to the auxiliary fan:
1. Remove the two jumpers on TB3 pins 1-2 and pins 2-3 located on the
operator interface panel.
2. Route the auxiliary AC line, neutral and ground wires through the base
access panel and connect the wires to the terminal block TB3, AC line to
TB3-2, AC neutral to TB3-4, and ground to TB3-5, see Figure 3-9.
Remote Emergency Switch Connection
To connect the remote emergency switch:
1. Remove the two jumpers on TB4 pins 1-2 and pins 3-4 located on the
operator interface panel.
2. Route the remote emergency switch wires through the base access panel
and connect the wires to the terminal block TB4.
External Fan Control Connection
To connect the external fan control:
1. Route the external fan control AC line 230 AC wire and the control wire
through the base access panel.
2. Connect the wires to the terminal block TB4, 230V AC Line to TB4 pins 5 and
fan control wire to TB4 pins 6, see Figure 3-9.
Figure 3-9 Aux, Neutral and Ground Wire Routing