Installation manual

Installation
3–4 153396 Revision D
This manual is for use by qualified installers only
Moving with a Sling
To move the Xantrex GT250 using a sling:
1. Place the lifting slings through the box tubing on the enclosure base at the
points specified in Figure 3-3 on page 3–4.
2. Lift the Xantrex GT250 from above.
3. Remove the shipping pallet from beneath the unit.
4. Once the shipping pallet is removed from the unit, use the same lifting
locations to lift the unit into the place where it may be permanently located.
Figure 3-2 Forklift Lifting Locations - Underneath Unit
66 cm (26 In) fork span
Figure 3-3 Moving with a Sling
2
1
3