Installation manual
About This Manual
iv 153396 Revision D
This manual is for use by qualified installers only
Organization
This Manual is organized into five chapters and two appendices:
Chapter 1, “Introduction” provides information about the features and functions
of the Xantrex GT250 Grid-Tied Photovoltaic Inverter.
Chapter 2, “Planning” provides information to help plan the installation of the
Xantrex GT250 Grid-Tied Photovoltaic Inverter.
Chapter 3, “Installation” describes the procedures needed to install the Xantrex
GT250 Grid-Tied Photovoltaic Inverter. This section includes unpacking and
moving instructions, mounting instructions, and cabling instructions.
Chapter 4, “Verification” provides a checklist to ensure the installation of the
Xantrex GT250 Grid-Tied Photovoltaic Inverter is correct and complete.
Chapter 5, “Commissioning” contains information for qualified personnel to safely
commission the Xantrex GT250 Grid-Tied Photovoltaic Inverter.
Appendix A provides the environmental and electrical specifications for the
Xantrex GT250 Grid-Tied Photovoltaic Inverter.
Appendix B contains the Commissioning Test Record for the Xantrex GT250
Grid-Tied Photovoltaic Inverter.
Conventions Used
The following conventions are used in this guide.
WARNING
Warnings identify conditions or practices that could result in personal injury or
loss of life.
CAUTION
Cautions identify conditions or practices that could result in damage to the unit or
other equipment.
Important: These notes describe things which are important for you to know, but
not as serious as a caution or warning.