Commissioning Test Record
B–4 153396 Revision D
This manual is for use by qualified installers only
I hereby undertake that the Xantrex GT250 inverter referenced above has been
commissioned by me, in accordance with the prescribed commissioning report
above and the commissioning procedures outlined by the manufacturer in the
Xantrex GT250 inverter's manual.
Email completed Commissioning Test Record to
re.field-service@us.schneider-electric.com or mail to:
Xantrex Technology Inc.
161-G South Vasco Road
Livermore, CA
USA
Attention: Customer Service
Step 10. Commanding Goal State: Matrix Test
Xantrex GT250 enters Matrix Test mode: Yes
Notes:
Step 11. Operate the Xantrex GT250 in Power Tracking Mode
I PPT Max% initially set to10 %: Yes
I PPT Max % gradually increased
Xantrex GT250 operates correctly: Yes
to 100 %: Yes
Notes:
Important: Failure to return the fully completed Commissioning Test Record to
Xantrex within 30 days after the completion of the commissioning may result in
the delay of warranty claim service or loss of warranty coverage for the Product. If
a third party (hereinafter, an "integrator") commissions a Xantrex GT250 inverter
on behalf of an end user of such inverter and such integrator fails to fully
complete and timely return the Commissioning Test Record, then Xantrex shall
have the right to fulfill such end user's warranty claims and recover from such
integrator all costs and expenses incurred by Xantrex in connection with such
warranty claims.
Signed by Commissioner
Printed Name, Title
Organization/Entity (if any)
Date of Actual System Commissioning
(If different to signature)
Signed by End User
Printed Name
Date