Installation manual
Commissioning Test Record
C–4 975-0601-01-01 Revision B
This manual is for use by qualified personnel only.
I hereby undertake that the Xantrex GT500 referenced above has been
commissioned by me, in accordance with the prescribed commissioning report
above and the commissioning procedures outlined by the manufacturer in the
Xantrex GT500’s manual.
Send an e-mail message with the completed Commissioning Test Record to
re.field-service@schneider-electric.com
or mail to:
Xantrex Technology Inc.
161-G South Vasco Road
Livermore, CA
USA
Attention: Customer Service
Step 10. Confirm Write Menu Parameters for Power Tracker Configuration
PPT V Ref: I PPT Max %:
PPT Enable: PPT Rate:
PPT V Rate:
Notes:
Step 11. Operate the Xantrex GT500 in Power Tracking Mode
I PPT Max% initially set to10 %: Yes I PPT Max % gradually increased
Unit operates correctly: Yes to 100%: Yes
Notes:
Signed by Commissioner
Printed Name, Title
Organization/Entity (if any)
Date of Actual System Commissioning
(If different to signature)
Signed by End User
Printed Name
Date