Installation manual

Index
IX–2 975-0601-01-01 Revision B
This manual is for use by qualified personnel only.
verify AC wiring 4–3
verify auxiliary power wiring 4–3
verify DC voltages 4–7
verify DC wiring 4–5
verify display 4–10
verify keypad 4–10
verify operational parameters 4–11
verify throat connection kit wiring 4–4
communications circuit 1–9
communications, remote 3–26
conductor requirements 2–4
conductor termination
wiring 20
conduits
bottom entry 2–6
entry 2–4
requirements 2–4
side entry 2–4, 2–5
configuring Modbus addresses 4–14
control card 1–9
control, remote 1–9
controls, operator interface 1–11
counter clockwise (CCW) v
crane requirements 3–2
cubic feet per minute (CFM) v
CW (clockwise) v
D
DANGER, definition iv
data logging 1–15
DC barrier
re-installing 4–8
removing 3–25
DC interface
inverter assembly 1–7
overview 1–11
power electronics 1–9
DC switch (S1) 1–12
DC terminals
bolt size and torque values A–5
polarity 3–26
DC voltages
verify for commissioning 4–7
DC wiring
commissioning verification 4–5
connecting 3–25
de-energize/isolation procedure xi
design features 1–2
digital signal processor (DSP) v
dimensions A–2, A–7
display
description 1–3
verification during commissioning 4–10
doors
closing
inverter assembly 3–17
transformer assembly 3–17
opening
inverter assembly 3–17
transformer assembly 3–17
DSP (digital signal processor) v
E
electrical specifications A–3
e-mail address, commissioning test record 4–14
ENABLE/DISABLE switch 1–11
enclosures
description 1–3
opening and closing doors 3–17
environmental specifications A–2
equipment
safety x
F
fans, heaters 1–10
fault detections
reporting 1–14
features, design 1–2
forklift
moving with 3–7
requirements 3–2
frequency ranges specifications A–4
G
graphical user interface (GUI) v
grid-connected photovoltaic arrays 1–2
grounding
bar 3–22
cable connections, throat connection kit 3–16
requirements 2–4
requirements (chassis) 3–21
GUI (graphical user interface) v
H
heat loss 2–3
heaters
fans 1–10
inverter assembly 1–8
transformer assembly 1–6